OV-TEST-INDEX · v0.2 · draft · 2026-08-07
DoctypeIndex
Doc idOV-TEST-INDEX
Product lineopenvvvf
Applies toopenvvvf-control-module, chassis-size-2, chassis-size-3
Version0.2
Date2026-08-07
Statusdraft
DescriptionFormal test reports and validation evidence for OpenVVVF hardware, firmware, and integration.
Nav order340

Testing and Validation

This section contains formal test records and validation evidence. Each document is evidence that a specific feature, requirement, or hazard mitigation was exercised.

Test evidence dashboard

Hardware

Test ID Name Motor class Status Trace Report
1 PMSM Resistance Calibration Validation PMSM draft motor self-commissioning / calibration routine Report
2 PMSM Inductance Calibration Validation PMSM draft motor self-commissioning / calibration routine Report
3 Power Resistor Sanity Check - draft motor self-commissioning / calibration routine Report
4 Induction Motor Testbed Induction draft motor self-commissioning / calibration routine Report
5 Induction Motor Resistance Calibration Validation Induction draft motor self-commissioning / calibration routine Report
6 Inductance Calibration Validation Induction draft motor self-commissioning / calibration routine Report

These reports validate the calibration routines on the C2 test fixture. The same routines are used on all OpenVVVF chassis; add a new report only when a different motor or harness is introduced.

Domains

  • Hardware - Electrical, thermal, mechanical, and environmental tests.
  • Firmware - Unit tests, integration tests, fault-injection tests, and safety-mechanism tests.
  • Integration - System-level tests combining control module and power stage.