Assembly Guide

This guide contains the ordered procedures for assembling a Chassis Size 2 inverter. Each chapter and step is numbered to match the recommended build order.

Chapter Status Notes
1. Preparation pending Placeholder - content to be added.
2. Frame and Buswork pending Placeholder - content to be added.
3. Main Assembly in progress 3.1 IGBT Mounting is complete; 3.2 DC Link Capacitor Bank is pending.
5. Final Assembly and Test pending Placeholder - content to be added.